Facilities

 

FCA practices in the Shimada Athletic Center at Friends' Central School. Within the last few years, FCA has been integrating new equipment into the facility, including a state-of-the-art timing system, starting blocks with wedges, and Competitor® lane lines.

Our facility includes:

  • Temperature controlled water system.
  • Automatic pool-filling system.
  • Textured floors to prevent injury around the pool.
  • 6 x 25-yard lanes, ranging from 4 feet to 12 feet in depth.
  • Colorado Timing System Video LED Scoreboard.
  • Colorado Timing System 6 Sports Timer.
  • 8 Speaker Audio and PA system.
  • Complete computer and database system for all swimmers and meet results, powered by Meet Manager and Team Manager.

 

FCA Vision Statement: A welcoming community where athletes are driven to achieve their full potential through dedication and teamwork.